MAX JACOB THEATRE
Designed by architect Georges Laffont, enriched by the Nantes sculptor Émile Gaucher and decorated inside by the Parisian Adrien Karbowsky, the Quimper theatre was finally inaugurated in 1904, after complex legal disputes that required a decree signed by President Émile Loubet. It was renamed the "Max Jacob Theatre" in 1997. A full house for its opening night, with Gounod's "Mireille" and Blainville's "Le Baiser", testified to the immediate attachment of the people of Quimper to their theatre.
The renovation aims to strengthen the citizens' sense of ownership of the building. It also completes the Max Jacob cultural hub in the town centre, between the river Odet and the historic garden, alongside the Novomax and the Très-Tôt Théâtre.
The refoundation of the Max Jacob Theatre brings together three aims:
- To offer a venue open to the widest variety of audiences, including those who still remain distant from culture.
- To complement the Théâtre de Cornouaille – Scène nationale with a high-performing yet simple venue, easy to use, to appropriate and to adapt, so that it can host the most diverse programmes: those of the City, of local professional cultural players and of the most active community projects.
- To enhance the monument, listed since 1997 for the quality of its façades, its roof and the large windows facing the Odet. Its interiors – mosaic floors, plaster decorations and the original sequence of foyers arranged as salons and galleries – are not protected, yet they received the same care in their restoration. The unusual shape of the Italian-style auditorium, with its very long horizontal balconies, defines the identity of the Max Jacob Theatre. These heritage qualities were therefore treated not as a constraint, but as an asset.
RESTORING THE BUILDING The existing building showed no major structural, framing or roofing pathologies. Several issues nevertheless required particular attention: - repairing the many spalled cornices and mouldings of the façades, minor movements in the lintel masonry, open and eroded joints, and a general cleaning;
- restoring or remaking the zinc flashings protecting the cornices;
- dismantling and rebuilding identically the monumental staircase, with a carefully reworked cement-bound backfill;
- dismantling and rebuilding a side staircase with the same methods and materials, but with a step count adapted for accessibility;
- restoring the original timber windows with large frames and steel glazing bars;
- reinforcing the lattice trusses of the steel roof structure to carry the additional weight of the thermal and acoustic insulation required by the venue.
The project extends this heritage approach to the interior renovation of the public spaces. The pleasure of live performance also lies in arriving at the theatre, in the intervals and in the conversations on the way out – this is how a theatre creates social bonds. The building offers an original "collection" of salons, in galleries or in enfilade, which cannot host large gatherings but provides a variety of atmospheres (bar, smoking rooms, main entrance foyer, exhibition gallery, salons). They have been brought out by a restoration that recovers one of the theatre's distinctive features: - restoring or evoking the decors after research into the original arrangements;
- restoring and filling the gaps in the marble-fragment mosaic floors, the polychrome lattice-pattern tiles and the oak "English-style" parquet;
- restoring the glazed doors with glazing bars, fixed side panels and half-moon fanlights;
- recreating a better integrated entrance airlock.
The auditorium had lost the qualities it was praised for at its opening: degraded modern paintwork, acoustic fibre ceilings and monochrome plaster decor. To evoke its original splendour, several choices were made: - reopening the balconies to the public to restore the spirit of the hall and its sense of enveloping the audience, with the restoration of the curved plaster-on-lath balustrades and their floral relief decoration;
- restoring the plaster-on-lath proscenium arch, with its relief decoration of palms and pine cones;
- rebuilding a ceiling with a cloister-vault cove;
- reworking the surfaces, with an undulating lining at stalls level for acoustic correction;
- installing blackout curtains, opening "à l'italienne", for the large reopened side windows and the half-moon windows.
A MODERN TOOL The theatre's facilities had become obsolete: scenery access by an external hoist, insufficient backstage services, a raked stage, and poor audience comfort due to bad sightlines, cramped rows, very poor acoustic insulation from the outside and constant noise from the technical installations. The first choice was to rebuild the stalls. The rake did not allow access for people with reduced mobility, and the stage edge was "perched" 1.30 m above the lowest point of the stalls, hampering sightlines and creating too strong a boundary between the performance and its audience. Raising the stalls with a better-suited rake also made it possible to embed air-supply outlets in the floor and the control networks, to create non-discriminatory wheelchair places and to remove the risk of falling from the stage. The hall now seats 283: 235 in the stalls, including 7 wheelchair places, and 48 in the balcony.
The second choice, to welcome the widest range of performances, was to level the stage while keeping the historic understage structure as a technical pit.
The third choice was a new scenographic equipment, including: - a new grid raised into the volume of the roof structure, with fully motorised machinery;
- new, easily accessible stage galleries;
- a motorised forestage bar above the proscenium;
- a technical gallery in the auditorium, which creates a second gallery level, complemented by a mobile lighting cradle travelling from stage left to stage right so as not to clutter the restored volume;
- two lighting boxes, stage left and stage right, at balcony level;
- a new control room at balcony level.
The fourth choice was an extension providing the backstage spaces that were lacking, with poor working conditions for performers and technicians. The project proposes a light, simple and reversible raising of the south wing, which houses: - at stage level: the green room, an accessible stage-level dressing room and storage;
- on the upper level: the dressing rooms and the dimmer room;
- in the roof space: the technical plant.
At its centre, a large scenery lift (shaft 3.50 x 2.70 m) serves the stage from the rear courtyard and forms an acoustic airlock from the outside, with a guillotine door on the façade and a sliding door at the back of the stage. On every level behind the stage, a protected passage at least 1.10 m wide now links stage left and stage right for performers and technicians.
Simplicity, respect for the symmetrical composition, the roof pitches and the rhythm of the bays are the main principles of the architectural approach. The choice of zinc for the raised volume distinguishes the additions from the original building without mimicry, and announces the theatre's new ambitions on the garden façade.
Finally, the campaign corrected other functional shortcomings and regulatory non-compliances identified in the preliminary survey: - Level changes were recurrent throughout the building (monumental staircase at the main entrance, steps between the foyers, toilets in the basement, multiple entrances along a raked auditorium). The rebuilt floor of the east gallery is now level with the auditorium entrances, the entrance foyer, the side salons and the main gallery, and a new lift serves all public areas and the stage from the garden.
- Most technical installations were entirely rebuilt to provide the expected comfort for spectators and efficient operating conditions: reinforced roof insulation, silent tempered-air supply beneath the stalls and behind the balconies, as close as possible to the audience, new smoke vents over the stage, and heating and ventilation controlled by zone according to the performance and activity schedule.