Comédie de Béthune
Extension - restructuring of the National Drama Theater « Comédie de Béthune ».
A BUILDING WITH A PRECIOUS HISTORY
Firstly named “National Drama Center of the Nord Pas de Calais” then “Theater of the Northern Countries” and finally renamed “La Comédie De Bethune” by Agathe Alexis and Alain Barsacq who managed it from 1992, this theater distinguishes itself by its location in the heart of a territory marked by the crisis.
Since the 1980s, culture has become a priority in the development of the Nord-Pas-de-Calais area; “La Comédie De Bethune” reflected the will of the elected representatives of the department to be equipped with a National Drama center.
Place of reference and artistic excellence where the theater can express itself in all its forms and reach all audiences, the building contributes strongly to the attractiveness of the area and represents the most emblematic cultural equipment of the city.
Installed in a marquee with three hundred seats in 1992, the theater moved in 1993 in an old powder magazine, built by Vauban and refurbished into a «Studio Theater» which is still used nowadays.
There was initially a movie theater called «The Palace» built in the 1930s on the present site of “La Comédie De Bethune”. The facade of the building maintained by girders, was all that was left when it was demolished in the 1990s.
In 1994, the agency MANUELLE GAUTRAND ARCHITECTURE won the competition for the construction of the theater. From the beginning, the project anticipated what has now become an extension: it already was in the form of two functional sections, the first one containing most of the program, which was then carried out, the second one immediately unrealizable because it was positioned on the corner of the plot, involving the demolition of a house.
From 2009, the corner house having been demolished, the extension of “La Comédie De Bethune” was able to be realized at the same time as the renovation of the existing theater.
The agency MANUELLE GAUTRAND ARCHITECTURE, laureate of a new architectural competition for this extension, took advantage of this unique opportunity to improve and complete the global functioning of the theater and endow it with a rehearsal room allowing the presence of the artists on the site.
THE EXISTING BUILDING (THEATER DELIVERED IN 1999)
The building delivered by the agency in 1999 included most of the features, but compared to a conventional theater, there was still missing a rehearsal room for the artists (provided by the current extension).
This first piece has been installed «around» the conserved house on what was available on the plot, adopting a “S” form complicated by this context. A big part of the plot was naturally dedicated to the room and its direct additional premises (dressing rooms, backstage, state control) while the narrowest part of the north was for the rest of the functions, with the lobby, the administration, and the accompanying facilities (toilets, technical rooms. ...).
The implementation of a slightly sloping ground at the ground floor has permitted to add at the very last moment a coffee bar under the slope of the flowerbed of the room, so as to create a friendly place, both to the artists and the public.
In order to capture the best of this complex and narrow site, the architectural concept had been to create a very compact project with spaces close to each other, and facilitating the displacements from one space to another. The program was divided into two parts sharply juxtaposed: one intended for the artists, opening on the boulevard Victor Hugo, and the other one intended for the public facing the November 11th street.
This second part was the smallest, its more complex volume was inserted in the artists’ building: the flat and regular floor of the ground floor, came down from the November 11th street where is located the lobby, up to sunken the boulevard Victor Hugo where was the bar. The bar was under the slope of the bleachers of the room, the whole arrangement created a very fluid and unitary space, sliding from one end to the other of the plot.
Inside the section intended for the artists, the functions are linked and follow each other with rigor: on one side the back-stage, on which all the cabins of the artists and their accompaniment premises are superimposed, then the scene, the proscenium, and finally the room on which comes to settle in height the state control, above the back seats. The scene is constituted by a tray of 240 m 2 with a stage bellow on the same surface, and above the grid and the false grid. The proscenium also has a grid that can be equipped. The distance between the lowest point of the bottom of the scene and the highest point of the grid is 21 meters.
The building represents a very large volume entirely in concrete varnish in dark purple. The shape of this volume is slightly curved and rounded, giving it an almost precious appearance and certain softness.
Manuelle Gautrand did not attempt to hide the important volume of the building, but to assert this shape, and improve it by rounding it and dressing it entirely in purple varnish. This warm color used several references: the theater, often red through the ages, a timeless and strong color.
It is also a reference to the Northern bricks, to the colored facades that goes from red to brown through purple. When the color of the bricks is not bright enough to contradict the gray sky, they are often painted, reinforced with large flat glowing which is brightening up the city.
The facades thus present a monumental aspect and distinguished themselves by their purple satin color. The surface of the varnish is covered with a pattern from stencil, drawing very graphically a frieze of black glazed bricks, from the floor to the top. This stylized frieze has allowed giving a certain scale to the facades of this part of the project.
Furthermore, the other element coming to recall the scale of the environment is the facade of the former movie theater identically reproduced since it’s a part of the historical heritage of the residents of Bethune.
GOALS OF THE EXTENSION AND THE RENOVATION:
Today, the street corner house having been demolished, the extension was able to be realized after 16 months of work, partially in occupied site. The agency Manuelle Gautrand Architecture took this opportunity to put in the current building safety regulations (which have changed since 15 years).
The project reached two main goals:
•Realize the extension, planned since 1994, including the rehearsal room
•Put in the new safety regulations and renovate the theater (the administration, the hall...).
1/ THE EXTENSION:
The extension is located on the corner of the plot, on three levels: a volume of high-rise located on the same level as the natural ground, and dedicated to the rehearsal room; then a level of offices, which links with the existing office floor to the second floor of the building.
The size of the rehearsal room allows relocating the hall on the corner of the November 11th street and the Avenue Victor Hugo, a provision that already existed during the competition in 1994. This position has several advantages: it allows to give a better visibility to the theater and to make the coffee bar more accessible. The coffee bar formerly located under the volume of the room’s floor, could not benefit neither of a direct entrance from the Avenue Victor Hugo, nor a natural lighting.
Now, the construction of the hall corner connects directly to the coffee, bringing a natural lighting and making it an animated and welcoming passageway.
Above, the administration has a larger and more functional space thanks to the extending from the second floor of the existing theater.
2/ RESTRUCTURING OF THE EXISTING:
Many spaces have also been changed within the existing building. Indeed, since the delivery of the original building fifteen years ago, the safety regulations have evolved considerably. This project therefore involved the upgrading of the entire building. Several safety regulations were concerned, including the fire safety regula- tions and the accessibility to all spaces of the theater for disabled people.
The extension also required the construction of a staircase located on the right of the future hall and serving on the first floor the upper level of the rehearsal room of the CNAD (National Academy of the Dramatic Arts) and its additional premises, and the offices on the second floor. Finally, the building reached the most ambitious thermal and energy regulations.
3/ THE ROOM ABOVE THE PIT:
The agency used all these work to complete this room, which had been left «raw» during the construction of the original building, into a second rehearsal room without grid, and smaller than the main rehearsal room, with an access facilitated by the raising of the staircase of the offices.
Surface : 2.0820 sqm in total, including extension of 720 sqm
Extension & restructuring cost: about 3,6 million Euros including all taxes
Theater of 350 places, with grid, 15-meter high and 14-meter large scene frame, 15,50-meter large and 13,50-meter deep theater floor with trap room, grid and fake grid. Rehearsal space with grid.
Initial building : competition: 1994, delivered in 1999. - Extension-restructuring: competition : 2009, Stu- dies: 2010-2013, Construction: 2013-2014, Opening of the new theater with its rehearsal space : september 2014.