Two permanent bridges are linked by a narrow diagonal span over Carpenters Lock at the centre of the Olympic Park. During the Olympics a central temporary infill between the bridges accommodates the crowds. In the legacy park, two bowls are created on either side of the lock linking the upper park concourse with the lower level of towpaths and waterways.
"heneghan peng architects":http://www.hparc.com/work/central-park-bridges-f06-at-the-london-2012-olympic-park/
Credits:
Collaborators
Structures | Civil: Adams Kara Taylor
Structural Steel Specialist: Waagnar Biro
Cladding Specialist: Waagnar Biro