Swedbank Head Office
The Swedbank’s new head office building in Vilnius is located in a fairly recently developed but rapidly growing political, commercial and recreational centre of the Lithuanian capital, which was moved from its historical centre to the right bank of the Neris River. The exclusive location of the building created a number of challenges. “We wanted the building to become an integral part of the development of the Neris River right bank, completing it in an original way designing the space around it without becoming the centre of attention” – says Audrius Ambrasas.
A distinctive feature of the new head office building is its openness and accessibility by the public. The site for the Banks building is being developed on the old Ukmerges street which becomes the main axis of the buildings composition. The internal pedestrian street (the old Ukmerges street) and the flowing spaces on the building’s ground floor are planned as an public urban space. The building consists of two parts: high-rise part of two 15 and 16 storey high structures and the lower part comprises two more blocks: the broken-lined parterre and the regular four-storey administrative part. The highlight of the building is the over 4500 m² terrace, constructed on the stylobate part and offering excellent views of the river bank.
The ground floor, under the terrace, opens a wide one-piece space. This artfully crafted part of the complex seeks to become an important public attraction centre even during cold seasons of the year. It comprises a café for 150 visitors, both employees and guests of the bank, and also an auditorium for an audience of 150 people and a reading room, in addition to the customer servicing centre and the business centre.
The developers and the designers demonstrate their respect to the public by using high-quality, long lasting and aesthetic materials and details. The most important - finishing of the blank facade walls performed using stainless-metal plates polished in different directions. The ornamental effect was obtained by varying the plate polishing direction what makes the facade look multi-colored.
Design team: Audrius Ambrasas, Vilma Adomonytė, Tomas Eidukevičius, Donatas Malinauskas
Total area (above-ground): 23 000 m2
Total area (underground): 19000 m2
Competition: 2005, 1st prize
Technical project: January 2007
Realization: 2007-2009